当前位置:首页 > 招投标合同范本 > 建设工程招标代理委托合同正文站内搜索:
建设工程招标代理委托合同

项目名称:                                        
 委托单位:                             (公章)                            
(甲方)

代理单位:                             (公章)
(乙方)

合同签订日期:      年     月      日

本合同双方:
委托单位(甲方):                                                                     
代理单位(乙方):海口建诚工程招标代理有限公司                    
委托方将                                   项目的招标事宜委托乙方代理,依据《中华人民共和国招标投标法》及有关法律、法规的规定,合同双方经协商一致,签订本合同。hetong.11665.com
一、代理业务的内容、形式:
甲方委托乙方组织建设工程招标活动。
工程概况:                                                  
                                                                    
本次招标范围 :                                             
                                                                                                         
1、招标代理的内容:填写申请表格,编制招标文件(包括编制资格预审文件);审查投标人资格;组织投标人踏勘现场和答疑;组织开标、评标、定标;提供招标前期咨询等业务。
2、招标代理的形式:

二、工作条件和协作事项:
    1、建设工程规划临时许可证、建设项目资金来源证明等(详见《办理建设工程招标投标需提交的资料》清单)。
2、委托方提供能够满足施工,标价计算要求的施工图纸及技术资料;或者经符合资质条件的工程造价咨询机构编制的建设项目投资预概算。
3、乙方代理过程中,遵守国家、地方有关工程建设招标、投标法规,坚持公开、公平、公正和诚实信用的原则,按照有关程序规定进行,接受招标监督管理部门的监督。
     4、委托代理人在签订本合同时,应出具委托证书。
三、委托期限:
本合同自签订之日起执行,中标通知书签发后自行废止。

四、费用支付方式及日期:
1、本工程造价为人民币                                             


                                    (大写),收取代理费用合计人民币                                     (大写)。付款方式为 现 金     或 转 账  ,代理费用应在开标前全部付清。代理费用不包含编制标底的费用、资格预审及评标专家费用。(收费标准:按国家计委计价格[2002]1980号) 
2、投标单位购买标书每份工本费计人民币          元(大写),所得归乙方。
五、违约责任:
1、双方都必须严格遵守签订的代理合同条款、不得违约;
2、委托方应提供真实可靠的相关资料,及按第四款第一条约定支付代理费用,否则一切责任由委托方自负。
3、双方在合同执行过程中出现争议,可协商解决,也可由相关部门进行调解。
4、双方对代理合同条款变更时必须另签补充合同条款,补充合同条款作为本代理合同的组成部分与主合同具有同等法律效力。
5、本合同一式三份,甲方一份,乙方一份,报招标管理机构一份。
六、双方协议的其他条款:
                                                                                       
                                                                                                                                                                                                                                                                                        
                                                                                                          
委托方(甲方):                           代理方(乙方):法定代表人(签章):                       法定代表人(签章):
单位地址:                                单位地址: 
联系电话:                                联系电话: 
邮政编码:                                邮政编码: 
开户银行:                                开户银行: 
银行帐号:                                银行帐号: 

签定日期:       年     月     日


国际工程招标说明书格式(英文)
       invitation to tender 
         
      whole doc. 
      date: 
      tender no. 
      1. the people's republic of china has-applied for a loan and creditfrom the world bank towards the cost of ________________ project. it isintended that part of the proceeds of this loan and credit will be appliedto eligiblepayment under various contracts for ____________ , __________,__________. tendering is open to all tenderers from eligible sourcecountries as definedunder the "guidelines for procurement" of the worldbank. 
      2. ___________ company now invites sealed tenders from pre-qualifiedtenderers for provision of the necessary labour, materials, equipment andservices for the construction and completion of the project. 
      3. pre-qualified tenderers may obtain further information from, andinspect the tender documents at the office of: ________. 
      4. a complete set of tender documents may be obtained by anypre-qualified tenderer for the cost of rmb _________ or us $ ___________on the submission of a written application to the above. 
      5. all tenders must be accompanied by a tender security in anacceptable form and must be delivered to ________ company at theabove-mentioned address (refer to item 3) on or before ___________. 
      6. tenders will be opened in the presence of those tenderers'representatives who choose to attend at ____________ (time). 
      7. if a prequalified foreign tenderer wishes to form joint venturewith a domestic contractor, such a request will be considered if receivedwithin ______ days before the closing date for submission of tenders. theselected local contractor shall be subject to approval by the employer. 
      8. the pre-tender meeting will be held on __________ at the followingaddress: _________. 
       
      instructions to tenderers 
       
       
      general1. description of works (sketch) 
      all tenderers shall have equal access for supply of domestic labourandmaterial. 
      the contractor shall make his own arrangements for the procurement oflocal labour, materials, transportation and other services. 
      the employer will assist contractor in locating potential number ofsuppliers for local labour, materials. the employer will also assist thecontractor in making his own arrangement for supply of fuel  andexplosives.2. source of funds 
      2.1 the people's republic of china has applied for a loan and creditfrom the world bank (hereinafter referred to as the ifi) towards the costof ____________ project, and intends to apply a portion of the proceeds ofthe loan and credit to eligible payments under the contract for whichthese documentsare issued. payment by the ifi will be made only at therequest of the chinese government and upon approval by the ifi and will besubject in all respectsto the terms and conditions of the loan agreement.no party other than the people's republic of china shall derive any rightsfrom the loan agreement or haveany claim to the loan proceeds. 
      2.2 payment from the proceeds of the world bank loan will be limitedto goods produced in, and services supplied from, switzerland and themember countries of the world bank which have commercial relations withchina. 
      2.3 all costs not met by the ifi loan will be paid by the employerfrom funds allocated by the government of china.3. eligibility and qualification requirements 
      3.1 this tender is open to all pre-qualified tenderers from eligiblesource countries as defined under the "guidelines for procurement" of theworld bank. 
      3.2 all goods and services to be supplied under this contract shallhave their origin in eligible source countries, and all expenditures madeunder the contract will be limited to such goods and services. 
      3.3 the origin of goods and services is distinct from the nationalityof the tenderer. 
      3.4 to be eligible for award of contract, tenderers shall haveprovided evidence satisfactory to the employer of their eligibility underclause 3.1 above, and of their capability and adequacy of resources toeffectivelycarry out the contract. to this end, the employer and____________ company may, at any time prior to award of contract, requesttenderers to amplifyor update previously submitted prequalification data.all tenders submitted sha 
    【正  文】include the following information: 
      (a) copies of original documents defining the constitution or legalstatus, place of registration and principal place of business of thecompany, firm or partnership or, if a joint venture, of each party theretoconstituting the tenderer; 
      (b) the qualifications and experience of key personnel proposed foradministration and execution of the contract, both on and off site, in theformat prescribed in schedule v; 
      (c) major items of constructional plant and equipment proposed for usein carrying out the contract in the format prescribed in schedule iv; 
      (d) a list of proposed sub-contractors in the format prescribed inschedule vi; 
      (e) information regarding any current litigation in which the tendereris involved; 
      (f) the details of the construction methods proposed. 
      3.5 for the purposes of sub-clause 3.4, tenderers who have beenpre-qualified may update and augment the information supplied with theirapplication for pre-qualification, and, in particular,  shall  giveparticularsof work in hand at the date of tendering. 
      3.6 tenders submitted by a joint venture of two or more firms aspartners shall comply with the following requirements: 
      (a) the tender, and in case of a successful tender the form ofagreement, shall be signed so as to be legally binding on all partners; 
      (b) one of the joint venture members shall be nominated as sponsor;andthis authorisation shall be evidenced by submitting a power ofattorneysigned by legally authorised signatories of all the members ofthe joint venture; 
      (c) the joint venture sponsor shall be authorised to incur liabilitiesandreceive instructions for and on behalf of any and all members of thejoint venture and the entire execution of the contract including paymentshall be done exclusively with the joint venture sponsor; 
      (d) all members of the joint venture shall be liable jointly andseverally for the execution of the contract in accordance with thecontract terms, and a relevant statement to this effect shall be includedin the authorisation mentioned under (b) above as well as in the form oftender and the form of agreement (in case of a successful tender); and 
      (e) a copy of the agreement entered into by the joint venture partnersshall be submitted with the tender. 
      3.7 domestic tenderers or combinations or joint ventures of domesticandforeign tenderers applying for eligibility for the application of a_____% margin of preference in the comparison of their tender with othertenders shall supply all information required to satisfy the criteria foreligibility as described in clause 29 of these instructions.4. cost of tendering 
      the tenderer shall bear all costs associated with the preparation andsubmission of his tender and neither the employer nor his  agent___________ company will in any way be responsible or liable for thosecosts, regardless of the outcome of the tendering process.5. site visit 
      5.1 the tenderer is advised to visit and examine the site of the worksandthe surroundings and to obtain for himself on his own responsibility,all information that may be necessary for preparing the tender andentering into a contract. the costs of visiting the site shall be at thetenderer's own expense. 
      5.2 arrangements for a visit to site, including transportation andaccommodation. will be made by the employer or his agent _________ companyand will be advised to tenderers at the pre- tender meeting, details ofwhich are given in clause 16 of these instructions to tenderers., 
      5.3 the tenderer and any of his representatives will be grantedpermission by the employer or his agent ___________ company to enter uponits premises and lands for the purpose of such inspection by priorarrangement, but only upon the express condition that the tenderer and hisrepresentatives, will release and indemnify the employer or his agent___________ companyand its personnel from and against all liability inrespect thereof and willbe responsible for personal injury (whether fatalor otherwise), loss of or damage to property and any other loss, damage,costs and expenses however caused, which, but for the exercise of suchpermission, would not have arisen. 
       
      tender documents6. content of tender documents 
      6.1 the set of documents issued to pre-qualified tenderers for thepurpose of tendering will cost rmb_______ or us $ ______ and will includethe stated number of copies of the following: number of copies       description 1    volume 1       instructions to tenderers 
       
      conditions of contract: 
       
      part i--general 
       
      part ii--conditions of particular 
       
      application 1    volume 2       specification 
       
      (incl. list of drawings) 3    volume 3       form of tender andappendix thereto 
       
      form of tender security 
       
      bill of quantities 
       
      schedules of supplementary information 1    volume 4       drawings 
      6.2 tender documents shall include any addenda issued prior to theclosing date of tenders in accordance with clause 8 and any minutes ofpre-tender meetings issued in accordance with clause 16 of  theseinstructions to tenderers. 
      6.3 further copies of the documents may be purchased by pre-qualifiedtenderers for a non-refundable fee as follows: (sketch) 
      6.4 sub-contractors, manufacturers, suppliers and others who requirecopies of the documents shall not request them directly from _____________but shall obtain them only from pre-qualified tenderers. 
      6.5 on return of the documents in an undamaged and useable condition,either as part of a tender or otherwise, within the specified time limits,the tenderer's pre-qualification fee will be refunded, as follows: 
      (a) tender submitted: _________________% refund of fee 
      (b) tender not submitted but ________________% refund of fee 
      documents returned prior to closing date of tender 
      6.6 the tenderer is expected to examine carefully all instructions,conditions, forms, terms, specifications and drawings in the tenderdocuments. failure to comply with the requirements of the instructions totenderers wi 
    【正  文】be at the tenderer's own risk. tenders which are notsubstantially responsive to the requirements of the tender documents maybe rejected. 
      6.7 the four volumes of the tender documents have been collated andbound by mechanical means and tenderers should check to ensure that theycontaina 
    【正  文】pages (which are numbered consecutively) and that allsupplementsreferred to are also included.7. clarification of tender documents 
      7.1 a prospective tenderer requiring any clarification of the tenderdocuments may notify ___________ in writing or by telex at the followingaddress: __________. 
      the employer or his agent _____________ will respond in writing to anyrequest for clarification which is received more than _____ days prior tothe deadline for submission of tenders. written copies of the response(including an explanation of the query, but without identifying the sourceof the inquiry) will be sent to all prequalified tenderers who have beenissued with tender documents.8. amendment of tender documents 
      8.1 prior to the deadline for submission of tenders, the employer may,forany reason, whether at its own initiative or in response to aclarification requested by a prospective tenderer, modify the tenderdocuments bythe issue of an addendum. 
      8.2 the addendum will be sent in writing or by telex or telegram toallpre-qualified tenderers who have picked up the tender documents andwill bebinding upon them. prospective  tenderers  shall  promptlyacknowledgereceipt thereof by telex or telegram to ____________. 
      8.3 in order to afford prospective tenderers reasonable time in whichto take an addendum into account in preparing their tenders, the employeror his agent _________ may, at their discretion, extend the deadline forthe submission of tenders in accordance with clause 19 hereof. 
       
      preparation of tenders9. language of tender 
      9.1 the tender and all correspondence relating to the tender exchangedby the tenderer and the employer or his agent __________ shall be inenglish. supporting documents and printed literature furnished by thetenderer with the tender may be in another language provided they areaccompanied by an appropriate english translation of pertinent passages.for the purpose of interpretation of the tender, the english version shallprevail.10. documents comprising the tender 
      10.1 the tender to be prepared by the tenderer shall contain thefollowing: 
      the form of tender and appendix thereto; 
      the tender security; 
      the priced bill of quantities; 
      the schedules of supplementary information; 
      the information on eligibility and qualifications; 
      alternative offers, if any; and 
      any other information required to be submitted in accordance withthese instructions. 
      the forms, bill of quantities and schedules provided in volume 3 ofthese documents shall be used without exception (subject to extensions ofthe schedules in the same format, and to the provisions of clause 14.2hereof regarding the alternative forms of tender security). 
      10.2 all documents issued for the purpose of tendering as described inclause 6.1 and addenda issued in accordance with clause 8 shall be deemedincorporated in the tender. tender documents not required to be signed andsubmitted in accordance with clauses 17 and 18 shall be returned to theoffice of issuebefore the expiry of the tender validity period, but mustnot be enclosed withthe tender. 
      10.3 tenderers shall submit with their tender a preliminary programmein the format required by clause 14 of the conditions of contract. 
      10.4 the successful tenderer will be required to revise or augment hisprogramme as set out in the contract.11. tender prices 
      11.1 unless explicitly stated otherwise in the tender documents, thecontract shall be for the whole of the works ______ as described in clause1 hereof, based on the schedules of unit rates and amounts submitted bythe tenderer. 
      11.2 the tenderer shall fill in rates and amounts for all items ofwork described in the bill of quantities, whether quantities are stated ornot. items against which no rate or amount is entered by the tenderer willnot be paidfor by the employer when executed and shall be deemed coveredby the other rates and amounts entered in the bill of quantities. 
      11.3 all duties, taxes and other levies payable by the contractorunder the contract, or for any other cause, as at the date ________ daysprior to the date for submission of tenders shall be included in the ratesand amountsand total tender sum submitted by the tenderer, and theevaluation and comparison of tenders by the employer shall be madeaccordingly. 
      11.4 the rates and amounts entered by the tenderer shall be subject toadjustment during the performance of the contract in accordance with theprovisions of the conditions of contract. the tenderer shall completeschedule iii-price adjustment provisions and shall submit with his tendersuch other supporting information as is required under clause 70 of theconditions of contract.12. currencies of tender and payment 
      12.1 the unit rates and prices shall be quoted by the tender entirelyin rmb. a tenderer expecting to incur expenditures in other currencies forinputs to the works supplied from outside china (referred to as "theforeign currency requirements") shall indicate in schedule i of "foreigncurrency requirements" the percentage of the tender price (excludingprovisional sums) needed by him for the payment of such foreign currencyrequirements either (i)entirely in the currency of the tenderer's homecountry or, at the tenderer's option, (ii) entirely in us dollars, alwaysprovided that a tenderer expecting to incur expenditures in a currency orcurrencies other than those stated in (i) and (ii) above for a portion ofthe foreign currency requirements, and wishing to be paid accordingly,shall so indicate the percentage portion in his tender. the percentageportion indicated shall remain fixed for the duration of the contract. theamounts in various currencies calculated on the basisof the percentagesindicated in the tender and by use of the exchange rates indicated insubclause 12.2 hereinafter, shall be used for the purposeofconversionand comparison of tenders pursuant to clause 70. 
      12.2 the rates of exchange to be used by the tenderer for currencyconversion shall be the governing selling rates published by the bank ofchina on the date ______ day prior to the latest date for the submissionof tenders.if exchange rages are not so published for certain currencies,the tenderer sha 
    【正  文】state the rates used and the source. for the purpose ofpayments, the exchange rates used in tender preparation shall apply forthe duration of the contract. 
      12.3 the total amount of foreign and local currencies expected to berequired by tenderers shall be substantiated in schedules i and i(a)-foreign currency and local currency requirements, and the annexthereto, tenderers shall describe the manner in which such foreign andlocal currencies are expected to be used, relating specifically, but notlimited to: 
      foreign currency 
      (a) expatriate staff directly employed on the works: 
      (b) social charges, insurance premiums and medical care related tosuch staff, and travel expenses between china and the country of origin; 
      (c) a list of the imported materials, both temporary and permanent,required for the works; 
      (d) depreciation and usage of plant and equipment, including spareparts, required for the works; 
      (e) insurance and freight charges for imported materials, plant andequipment, including spare parts; and 
      (f) overhead expenses, fees and financial charges incurred outsidechina. 
      local currency 
      (g) local labour; 
      (h) local materials; 
      (i) other services, and; 
      (j) overhead expenses, fees and financial charges within china. 
      12.4 tenderers may be required by the employer to clarify theirforeign currency requirements, and to provide satisfactory proof that theamountsincluded in the unit rates and in schedule i are reasonable andresponsive to sub-clause 12.1 hereof. 
      12.5 the tender shall complete schedule ii - estimated contractpayments and shall substantiate the tabulation of this schedule byattaching a table indicating anticipated major quantities of  workperformed over the duration of the works.13. tender validity 
      13.1 the tender shall remain valid and open for acceptance for aperiod of six calendar months from the specified date of tender closing. 
      13.2 in exceptional circumstances, prior to expiry of the originaltender validity period, the employer or his agent ____________ may requestthe tenderers for a specified extension to the period of validity. therequest andthe responses thereto shall be made in writing or by telex ortelegram. a tenderer may refuse the request without forfeiting his tendersecurity. a tendereragreeing to the extension will not be required norpermitted to alter his tender, but will be required to extend the validityof his tender security correspondingly. the provisions of clause 14 hereofregarding discharge and forfeiture of tender security shall continue toapply during the extended period.14.tender security 
      14.1 the tenderer shall furnish, as part of his tender, a tendersecurity in rmb yuan in an amount of not less than _____ % of the tendersum. 
      14.2 the tender security shall, at the tenderer's option, be in theform of a certified cheque, a bank draft, an irrevocable letter of creditor a guarantee from either: 
      (a) bank of china; 
      (b) any of its correspondent bank abroad through bank of china; 
      (c) any other chinese or foreign bank operating in china; 
      (d) any other foreign bank determined by the tenderer in advance ofsubmission of bids to be acceptable to ___________. 
      or a bond issued by an insurance company or bonding company likewiselocated. the format of the bank guarantee or bond shall be in accordancewith one of the sample forms included in these documents; other formatsmay be permitted subject to the prior approval of the employer or hisagent __________. letters of credit, bank guarantees and tender bondsshall be valid for one calendar month beyond the validity of the tender. 
      14.3 in the event of a tenderer agreeing to a specified extension oftender validity in accordance with clause 13 of the instructions totenderers, the tenderer shall provide an extension in the validity of thetender security of one calendar month beyond the validity of the extendedtender. 
      14.4 any tender not accompanied by an acceptable tender security willbe rejected by _________ as non-responsive. 
       


      14.5 the tender securities of unsuccessful tenderers will  bedischarged or returned as promptly as possible, but not later than ______days after the expiration of the period of tender validity prescribed. 
      14.6 the tender security of the successful tenderer will be dischargedor returned upon the tenderer executing the contract and furnishing therequired performance security. 
      14.7 the tender security may be forfeited: 
      (a) if a tenderer withdraws his tender during the period of tendervalidity; or 
      (b) in the case of the successful tenderer, if he fails to: 
      (i) sign the agreement; or 
      (ii) furnish the necessary performance security.15. alternative offers 
      15.1 the tenderer shall submit a basic tender which complies fullywith the requirements of the tender documents. the tenderer may, at hisoption,and in addition to the basic tender, offer tenders incorporatingalternativesto any of the following items now specified: 
      (a) advance loan for mobilisation 
      an interest free advance loan will be made available to assist thecontractor before commencing construction of the works. offers may be madefor such a loan of up to ________% of the tender sum. evaluation will bemade of theassociated costs or savings accruing to the employer inaccordance withclause 28. 
      (b) (written as specific conditions). 
      15.2 alternatives may be submitted in addition to basic tender. inorder for alternatives to be considered in the process of tenderevaluation, each alternative shall be accompanied by a detailed pricebreakdown indicating the tenderer's estimate of the additional or reducedcost in presentvalue to the employer (refer to subclause 28.3 hereof)compared to the basic tender sum. comparison and evaluation will be donefor the basic offer andalternatives of the lowest evaluated tenderer willbe given due consideration.ifthe alternative offers were to be acceptedby the employer, these will be incorporated into the contract. alternativeoffers which are not priced, or which are not substantiated in sufficientdetail, will be rejected. 
      15.3 offers of technical alternatives shall be accompanied by allinformation necessary for a complete evaluation,  including  designcalculations, drawings, method statements and specifications for materialsand workmanship where the alternative is not covered by the specification,together with a breakdown of the alternative prices and the totalalternative contract sum. 
      15.4 only those alternative offers which appear to provide additionalfinancial, economic or technical benefits over the basic offer will beconsidered by the employer in tender evaluation (refer to clause 28).16. pre-tender meeting 
      16.1 the tenderer or his official representative is advised to attenda pre-tender meeting which will convene on ______________at ___________ atthe ___________. 
      16.2 the purpose of the meeting will be to clarify issues and toanswer questions on any matter that may be raised at that stage and toallow tenderers to inspect the site and to examine conditions. 
      16.3 tenderers are requested to submit any questions in writing or bytelex or telegram, to reach__________ not later than one week before themeeting. 
      16.4 minutes of the meeting, including copies of the questions raisedandresponses given, will be furnished expeditiously to all thoseattendingthe meeting, and subsequently to all pre-qualified tenderers whohave pickedupthe tender documents. any modification of the tenderdocuments listed in sub-clause 6.1 which may become necessary as a resultof the pre-tender meeting shall be made by the employer or his agent___________ exclusivelythrough the issue of an addendum pursuant toclause 8, and not through the minutes of the pre-tender meeting.17. format and signing of tenders 
      17.1 the tenderer shall prepare one original and two duplicate copiesof the documents comprising the tender as described in clause 10.1 hereof,bound within the volume 3, and clearly marked "original tender" and"duplicate tender"as appropriate. in the event of any discrepancy betweenthem, the original shall prevail. 
      17.2 the original and two duplicate copies of the tender shall betyped or written in indelible ink and shall be signed by a person orpersonsduly authorised to bind the tenderer to the contract. proof ofauthorisation shall be furnished in the form of a written power ofattorney which shall accompany the tender. all pages of the tender whereentries or amendments have been made shall be initialled by the person orpersons signing the tender. 
      17.3 the complete tender shall be without alterations, interlineationsor erasures, except those to accord with the instructions of any agendaissued,or as necessary to correct errors made by the tenderer, in whichcase such corrections shall be initialled by the person or persons signingthe tender. 
      17.4 only one tender may be submitted by each tenderer, not includingalternative offers submitted pursuant to clause 15 hereof. no tenderer mayparticipate in the tender of another for the same contract in any relationwhatsoever.18. sealing and marking of tenders 
      18.1 the tenderer shall seal the original and two duplicate tenderseach in an inner and an outer envelope, duly marking the envelopes as"original" and "duplicate". 
      18.2 the inner and outer envelopes shall: 
      (a) be addressed to _________. (address of employer's agent) 
      (b) bear the following details: 
      (i) tender for construction of contract _________; 
      (ii) _________ project; 
      (iii) "do not open before __________." 
      18.3 the inner envelopes shall bear the name and address of thetenderer to enable the tender to be returned unopened in case it isdeclared late. the outer envelope shall not bear any identification of thetenderer. 
      18.4 if the outer envelope is not marked as instructed above,_________ company will assume no responsibility for the misplacement orpremature opening of the tender. a tender opened prematurely for thiscause will be rejected by the employer or his agent ___________ andreturned to thetenderer.19. deadline for submission of tenders 
      19.1 tenders must be received by ______________ at the addressspecified above no later than _________. 
      19.2 the employer or his agent __________ company may, at theirdiscretion, on giving not less than ________ calendar days notice by telexor telegram to all pre-qualified tenderers who have picked up the tenderdocuments, extend the deadline for the submission of tenders by issuing anaddendum in accordance with clause 8, in which case all rights andobligations of the employer and the tenderers previously subject to thedeadline shall thereafter be subject to the new deadline as extended.20. late tenders 
      any tender received by ___________ company after the prescribeddeadline for submission of tenders will be returned unopened.21. modification andwithdrawal of tenders 
      21.1 the tenderer may modify or withdraw his tender after submission,provided that the modification or notice of withdrawal is received inwritingby __________ company prior to the prescribed deadline forsubmission of tenders. 
      21.2 the tenderer's modification or notice of withdrawal shall beprepared, sealed, marked and despatched in accordance with the provisionsfor thesubmission of tenders. a notice of withdrawal may also be sent bytelex or telegram, but shall be followed by a signed confirmation copy,postmarked not later than the deadline for submission of tenders. 
      21.3 subject to clause 24 hereof, no tender may be modified subsequentto the deadline for submission of tenders. 
      21.4 withdrawal of a tender during the interval between the deadlineforsubmission of tenders and the expiration of the period of tendervaliditymay result in the forfeiture of tender security pursuant toclause 14. 
       
      tender opening and evaluation22. tender opening 
      22.1 the employer or his agent __________ will open the tenders, inthepresence of tenderers' representatives who choose to attend, at___________ on _______________ at the offices of __________. tenderers'representatives who are present shall sign a register evidencing theirattendance. 
      22.2 tenders for which an acceptable notice of withdrawal has beensubmitted pursuant to clause 21 hereof shall not be opened. the employeror his agent ___________ will examine the tenders to determine whetherthey are complete, whether the requisite tender securities have beenfurnished, whether the documents have been properly signed, and whetherthe tenders are generally in order. 
      22.3 the tenderers' names, total amounts of tenders, tender pricemodifications and tender withdrawals, if any, the presence of therequisite tender security and such other details as the employer or hisagent ____________, at their discretion, may consider appropriate will beannounced at the opening. 
      22.4 the employer or his agent _____________ shall prepare minutes ofthetender opening for his own records. such minutes shall be sent to theworld bank together with the report on the evaluation of tenders as soonas the latter is available.23. process to be confidential 
      23.1 after the public opening of tenders, information relating to theexamination, clarification, evaluation and comparison of tenders andrecommendations concerning the award of contract shall not be disclosed totenderers or other persons not officially concerned with such processuntil the awardof a contract to the successful tenderer has beenannounced. 
      23.2 any effort by a tenderer to influence the employer in the processof examination, clarification, evaluation and comparison of tenders anddecisions concerning award of contract may result in the rejection of histender.24. clarification of tenders 
      to assist in the examination, evaluation and comparison of tenders,theemployer and _______________ company may ask tenderers individuallyfor clarification of their tenders, including breakdowns of unit prices.the requestfor clarification and the response shall be in writing or bytelex or telegram, but no change in the price or substance of the tendershall be sought, offered or permitted except as required to confirm thecorrection of arithmetical errors discovered by the employer during theevaluation of tenders in accordance with clause 26 hereof.25. determination of responsiveness 
      25.1 prior to the detailed evaluation of tenders, the employer and_________ company will determine whether each tender is substantiallyresponsive to the requirements of the tender documents. 
      25.2 for the purpose of this clause, a substantially responsive tenderis one which conforms to all the terms, conditions and specifications ofthe tender documents without material deviation or reservation. a materialdeviation is one which affects in any substantial way the scope, qualityor administration of the works, or which limits in any substantial way,inconsistent with the tender documents, the employer's rights or thetenderer's obligations under the contract, and the rectification of whichdeviation or reservation would affect unfairly the competitive position ofother tenderers offering substantially responsive tenders. 
      25.3 if a tender is not substantially responsive to the requirementsof the tender documents, it shall be rejected by the employer and_________ company.26. correction of errors 
      26.1 tenders determined to be substantially responsive will be checkedby the employer for any arithmetical errors in computation and summation.errors will be corrected by the employer as follows: 
      (a) where there is a discrepancy between amounts in figures and inwords, the amount in words will normally govern, unless it is clear fromthe context that the amount in figures is correct; and 
      (b) where there is a discrepancy between the unit rate and the totalamount derived from the multiplication of the unit rate and the quantity,the unit rate as quoted will normally govern unless, in the opinion of theemployer, there is obviously a gross error in the unit rate; in whichevent the totalamount as quoted will govern and the unit rate will becorrected. 
      26.2 the amount stated in the form of tender will be adjusted by theemployer in accordance with the above procedure for the correction oferrors and, with the concurrence of the tenderer, shall be considered asbinding upon the tenderer. the tenderer may, at his option, withdraw histender if acceptance of the corrected amount would cause hardship. howeverin cases such as this, the tenderer is warned that such an action maycause his tender security to be forfeited.27. conversion to single currency 
      the tender price is the sum of all payments stated or expressed as apercentage in various currencies required to be made to the tenderer. tofacilitate evaluation and comparison of tenders, the employer will convertthe amountsin various currencies in which the tender price is payable(excluding provisional sums but  including  daywork,  where  pricedcompetitively) to rmb atthe selling rates established by bank of china,on the date specified for theopening of tenders.28. evaluation and comparison of tenders 
      28.1 the employer and _____________ company will evaluate and compareonly those tenders determined to be substantially responsive to therequirements of the tender documents in accordance with clause 25 hereof.the evaluation and comparison shall be based only on the "basic" offer todetermine the lowest evaluated tenderer for award of the contract. 
      28.2 in evaluating tenders, the employer will determine for eachtender the evaluated tender price by adjusting the tender price asfollows: 
      (a) making any correction for errors pursuant to clause 26; 
      (b) excluding provisional sums and the provision, if any, forcontingencies in the summary bill of quantities, but including dayworkswhere priced competitively; 
      (c) converting all amounts to a single currency; 
      (d) adding any monetary cost of mobilisation advances, assessed inaccordance with sub-clause 28.3 
      (e) making an appropriate adjustment for any other acceptablequantifiable variations, deviations or alternative offers not reflected inthe tender price or in the above-mentioned other adjustments. 
      (f) such other factors as the employer considers may have apotentially significant impact on contract execution, price and payments,including the effect of items or unit rates in the tender that areunbalanced or unrealistically priced. 
      28.3 the monetary costs to the employer of variations in the amount ofmobilisation advances requested by tenderers pursuant to sub-clauses 15.1(a), using a discount rate of ______ percent per annum, shall be added tothe respective tenderer's tender price for comparison purposes only. 
      28.4 the employer and ___________ company reserves the right to acceptor reject any variation, deviation or alternative offer. variations,deviations, alternative offers and other factors which are in excess ofthe requirements of the tender documents or otherwise result in theaccrual of unsolicited benefits to the employer may not be taken intoaccount in tender evaluation. 
      28.5 price adjustment provisions applying to the period of executionof the contract shall not be taken into account in tender evaluation. 
      28.6 if the tender of the successful tenderer is seriously unbalancedin relation to the engineer's estimate of the real cost of work to beperformed under the contract, the employer may require that the amount ofthe performance security set forth in clause 34 be increased at theexpense of the successful tenderer to a level sufficient to protect theemployer against financial loss in the event of subsequent default of thesuccessful tenderer under the contract.29. preference for domestic tenderers 
      29.1 domestic tenderers shall satisfy the following criteria to beeligible for a _______% margin of preference in the comparison of theirtenderswith those of non-eligible tenderers: 
      (a) be registered within china; 
      (b) have majority ownership by nationals of china; and 
      (c) shall not subcontract more than ________% of the contract works(in terms of value) to foreign contractors. 
      29.2 combinations and joint ventures between domestic and foreignfirms shall be eligible for the margin of preference provided: 
      (a) the domestic partner or partners individually satisfy the criteriaforeligibility set out above; 
      (b) the domestic partner or partners will, under the arrangementsproposed, carry out at least ________% of the contract works, measured interms of value. 
      (c) the domestic partner or partners would not be qualified for thecontract works in question on technical or financial grounds without theforeignparticipation. 
      29.3 the following procedure will be used to give effect to the marginof preference: 
      (a) after tenders have been evaluated fully in accordance with theprovisions of clause 28 hereinabove, responsive tenders will be classifiedinto the following groups; 
      (i) group a: tenders offered by domestic tenderers meeting thecriteria set forth in sub-clause 29.1 hereinabove and by joint venturesmeetingthe criteria set forth in sub-clause 29.2 hereinabove; and 
      (ii) group b: tenders offered by other tenderers. 
      (b) for the purpose of further evaluation and comparison of tendersonly, an amount equal to _________ percent of the tender price (asadjusted pursuant to paragraphs (a), (b) and (c) of sub-clause 28.2) willbe added tothe evaluated tender price of tenders classified in group b. 
       
      award of contract30. award criteria 
      subject to clause 31, the employer and ________ company may award thecontract to the tenderer whose tender has been determined to  besubstantially responsive to the tendering documents and who has offeredthe lowest evaluated tender price pursuant to clause 28 and paragraph (b)of sub-clause 29.3 (if applicable), provided further that the tenderer hasthe capability and resources to carry out the contract effectively (referto sub-clause 3.5), butthe employer and _________ company gives noguarantee that the lowest orany tender will be accepted.31. employer's rights 
      notwithstanding clause 30, the employer reserves the right to acceptor reject any tender, and to annul the tendering process and reject alltenders, at any time prior to award of contract, without thereby incurringany liability to the affected tenderer or tenderers or any obligation toinform the affected tenderer or tenderers of the grounds for theemployer's action.32. notification of award 
      32.1 prior to the expiration of the period of tender validityprescribed by the employer, the employer will notify the successfultenderer by telex or telegram confirmed in writing by registered letterthat his tender has been accepted. this letter (hereinafter and in theconditions of contract called the "letter of acceptance") shall name thesum which the employer will pay to the contractor in consideration of theexecution, completion and maintenance of the works by the contractor asprescribed by the contract (hereinafter and in the conditions of contractcalled the "tender sum"). 
      32.2 the notification of award will constitute the formation of thecontract. 
      32.3 upon the furnishing by the successful tenderer of a performancesecurity in accordance with the provisions of clause 34 hereof, theemployer will promptly notify the other tenderers that their tenders havebeen unsuccessful.33. signing of agreement 
      33.1 within ________ days of notifying the successful tenderer thathistender has been accepted, the employer will send to the tenderer twocopies of the form of agreement provided in the tender documents,incorporating all agreements between the parties. 
      33.2 within__________ days of receipt of the form of agreement, thesuccessful tenderer shall execute the agreement by signing or sealing, asappropriate, and return both copies to the employer. the employer willthen execute the agreement and return one copy to the contractor.34. performance security 
      34.1 within _________ days of receipt of the letter of acceptance, thesuccessful tenderer shall furnish to the employer a security for the dueperformance of the contract, in accordance with the conditions ofcontract. the form of performance security provided in the tenderdocuments may be used, or some other form acceptable to the employer. 
      34.2 if the performance security is to be provided by the successfultenderer in the form of a bank guarantee, it shall be issued either by alocal bank; by a foreign bank through a correspondent local bank; or by aforeign bank which has been determined by the tenderer to be acceptable tothe employer. 
      34.3 if the performance security is to be provided by the successfultenderer in the form of a bond, it shall be issued by a bonding orinsurance company which has been determined by the tenderer to beacceptable to the employer. 
       
      34.4 failure of the successful tenderer to comply  with  therequirements of clauses 33 or 34 hereof shall constitute sufficientgrounds for the annulment of the award and forfeiture of the tendersecurity, inwhich event the employer may make the award to the nextlowest evaluatedtenderer or, if there are no other tenderers, call fornew tenders.

港口工程施工招标文件

目录

第一卷

第一章投标邀请书

第二章投标须知

第三章合同协议书

第四章合同通用条款

第五章合同专用条款

第二卷

第六章技术规格书

第三卷

第七章投标文件与保证书格式

第八章工程数量报价表

第四卷

第九章自然条件与勘测资料

第十章施工图纸


第一卷

第一章投标邀请书

(投标人全称):

1.为兴建(项目名称)工程,(业主名称)决定(或委托我单位)对(合同工程名称)工程施工进行招标。经资格预审合格,现邀请贵单位参加投标。

2.工程概况及招标范围

(1)工程概况:

(2)招标范围(或分标情况):

(3)主要工程量:

(4)工期要求:

3.贵单位可凭本邀请书自年月日至年月日(法定节假日除外)到招标单位购买招标文件或查阅有关资料。招标文件每套收取工本费人民币元,不予退还。

4.贵单位在递交投标文件时,应同时出具一笔金额为人民币10万元的投标保证。

5.现场考察定于年月日时进行,届时请自行到(详细地址)集中。

6.标前会议将于年月日时在(详细地址)举行。

7.送交投标文件截止期为年月日时,请将投标文件送达(详细地址)。对迟到的投标文件,招标单位将不予接受。

8.我单位将于年月日时在(详细地址)公开开标。届时,投标人须选派代表参加。

招标单位:(名称、盖章)

地址:

联 系 人:

电话:

传真:

邮政编码:

年月日

第二章投 标 须 知

一、总则

1.工程概况

(1)工程概述:(工程名称、地点、规模和招标范围及现场条件等。)

(2)主要工程数量:

(3)工期和质量要求:

2.建设依据和资金来源

(1)建设依据:

(2)资金来源:

3.投标人资格要求

(1)投标邀请书只发给资格预审合格的投标人(当采取邀请招标或议标方式而未进行资格预审时,可进行资格后审,各投标人必须按要求报送资格后审资料)。

(2)资格预审合格的投标人,在送交投标文件时应按新情况补充其在申请资格预审时所提供的资料,特别是提供将承担本工程的具体施工部门的资料。

(3)由两个或两个以上的投标人联合投标时,其条件应符合以下要求:

①联营人应签订联营协议书,并应共同委托一个牵头人为联营体代表,代表联营体在投标、签约和履行合同中承担义务和法律责任。联营协议书的内容应包括联营体的组织机构及各方的义务和责任,联营协议书副本应随投标文件一起提交;

②为了明确联营体代表的法律地位,联营体各成员应出具授权书,授权书由各法定代表人签署并加盖公章,提交招标单位。

(4)一个投标人不能同时参加两个或两个以上(包括联营体)对本工程的投标。如果出现此类情况,与此有关的投标将被拒绝。

(5)投标人必须对整个招标范围进行投标,只对其中的部分工程投标者,将不予评审。

(6)若投标人拟对部分工程进行分包,应在投标文件中予以说明。凡将主体工程进行分包的投标将不予评审。

4.投标费用

投标人在投标过程中发生的一切费用,不论中标与否,均由投标人自行承担(如果招标单位拟对未中标人给予一定的补偿,应具体说明)。

5.现场考察

(1)招标单位将于年月日时统一组织投标人对现场及其周围环境进行考察,以便使投标人获得有关编制投标文件和签订合同所必需的有关资料。

(2)现场考察时,招标单位将介绍工程的地形、地貌、水文、地质、气象、料畅水源、电源、通信、交通条件等,并提供必要的参考资料,以帮助投标人了解现场情况。但投标人应经过现场考察,对上述资料的理解负责。

(3)如果投标人认为需要再次进入现场考察,应事先征得招标单位的许可,招标单位将予以支持。

(4)在现场考察过程中,非招标单位的原因所造成的投标人的人身伤亡、财物或其他损失,招标单位均不负责。

(5)现场考察期间的食宿、交通由招标单位安排,费用由投标人自理。

6.标前会议

(1)标前会议将于年月日时在(详细地址)举行。投标人应派代表出席。

(2)标前会将澄清并解答投标人在现场考察及阅读招标文件后可能提出的有关问题。投标人对任何问题的疏漏或判断失误,应自行负责。

(3)投标人应在标前会议召开之前,将要求答复的问题书面提交招标单位,招标单位予以澄清和解答。招标单位将以书面形式(含补充通知书)答复所有已购买招标文件的投标人。

二、招标文件

1.招标文件的组成

除本款下述各卷册的内容外,招标单位在招标期间发出的其他正式文件和函件,均是招标文件的组成部分。各卷内容如下:

第一卷

第一章投标邀请书

第二章投标须知

第三章合同协议书

第四章合同通用条款

第五章合同专用条款

第二卷

第六章技术规格书

第三卷

第七章投标文件与保证书格式

第八章工程数量报价表

第四卷

第九章自然条件与勘测资料

第十章施工图纸

2.招标文件的澄清

投标人对招标文件的疑问应通过标前会议得到澄清和解答。在标前会议以后,若投标人仍有问题并要求对招标文件进行澄清和解答,应在送交投标文件截止10天以前,将要求澄清、解答的问题以书面形式送达招标单位。招标单位应在3天内将书面答复送达所有投标人。

3.招标文件的修改

(1)在投标截止期14天前,招标单位可以发出补充通知对招标文件进行修改。

(2)补充通知将以书面形式(包括传真、电报和电传)发送给所有已购买招标文件的投标人。投标人收到补充通知后,应以电报、电传或传真方式告知招标单位,说明补充通知已经收到。

(3)为了使投标人能得到合理的时间将补充通知的内容在编制投标文件时予以考虑,招标单位可以酌情延长投标文件截止期,并以书面形式发送所有已购买招标文件的投标人。

三、投标文件的编制

1.投标语言

投标文件以及投标人和招标单位之间的来往文件、均用中文书写,若需使用其它文字时,也应有汉语对照,其解释以中文文本为准。

2.投标文件的组成

(1)投标函;

(2)授权书;

(3)投标保证;

(4)工程数量报价表;

(5)施工组织方案;

(6)附表;

(7)资格预审补充资料(如果有,或资格后审资料);

(8)其他。

3.投标文件的编制

投标人应详细阅读招标文件,按招标文件的要求编写投标文件。如果投标文件不符合招标文件的要求,该投标文件将不予评审。

4.投标报价

(1)投标人应对整个招标范围进行投标报价。

(2)投标人应认真按工程数量报价表中所列的工程量和工程细目填写单价和合价。无论工程数量报价表中是否列明数量,投标人没有填入单价或合价的工程细目,施工之后,业主将不单独支付,并认为该细目的价款已包括在工程数量报价表其他细目的单价或合价中。

(3)投标报价中应包括有关税费、保险费、临时工程费和工程维护费等一切费用。

(4)投标人填报的单价和总价,在合同履行期间,只能按合同有关条款约定的方式进行调整。

(5)除合同专用条款另有约定外,本工程所需的一切材料、设备均由中标人自行采购、运输和保管。

5.投标有效期

(1)投标文件在开标之日后40天内有效。

(2)在特殊情况下,招标单位在原定投标有效期内可以根据需要向投标人提出延长有效期的要求,投标人应立即对此作出答复。若同意延期,投标人不得修改投标文件,但应相应延长投标保证的有效期。在延长期内,投标保证金的退还与没收的规定仍然适用。投标人可以拒绝招标单位的延期要求,而不会因此失去投标保证金。

6.投标保证

(1)投标人在递交投标文件时,应同时提交人民币10万元的投标保证。其形式可以选择银行保函、有价证券抵押或国内现行的其他保证形式。银行保函的格式应符合招标文件中列举的格式,采用其他格式应事先征得招标单位的同意。

(2)投标保证的有效期应较投标有效期延长28天。招标单位如果延长了投标有效期,则投标保证的有效期经投标人同意也相应延长。

(3)投标人如有下列行为时,招标单位将没收其投标保证金:

①在投标有效期内撤回投标文件;

②中标人收到中标通知书后28天内由于中标人的原因,未能或拒绝签订合同协议书,或未能提交履约担保。

(4)未提交投标保证的投标文件,招标单位将不予评审。

(5)投标人的投标保证金,在中标人提交了履约担保并签订了合同协议书后退还。

7.替代标(如果有)

(1)为使投标人能充分发挥自身的优势,达到优化设计、便利施工、提高工程质量和降低造价的目的,投标人在提交原设计方案的基本标的同时,只可提交一份替代标,并单独装订成册。

(2)替代标的设计方案应符合本招标文件技术规格书中的要求。

8.投标文件的签署

(1)投标人应提交三份投标文件,其中一份正本,两份副本。当副本与正本不一致时,以正本为准。

(2)投标文件须用不褪色墨水打印或书写后,由投标人的法定代表人或其授权代理人签署(授权书附在其内)并加盖公章。

(3)投标文件不应涂改、行间插页或删除,如果出现上述情况,均应由投标文件签字人在改动处签字。

四、投标文件的送交

1.投标文件的密封和标记

(1)投标人须将投标文件正本与副本密封包装在双层封套内并标明"正本"、"副本"字样。

(2)有替代标时,投标人应在提交的每一份标书上标明"基本标"或"替代标",以资区别。

(3)在投标文件外层封套上应写明:

①收件人(招标单位)的名称和详细地址;

②项目投标文件;

③在开标前不得开封。

(4)内层封套上应写明投标人的名称与详细地址,以便迟到的投标文件得以原封退回。

(5)如果投标文件未按上述规定密封和标记,而使投标文件迟到、遗失或失密,招标单位概不负责。

2.送交投标文件的截止时间

(1)投标人必须在招标文件规定的截止期前将投标文件送(寄)达招标单位。

(2)招标单位根据本"须知"有关规定发出补充通知后,如果决定推迟送交投标文件截止时间,至少应在原定截止期14天前将此决定书面通知所有投标人。在此情况下,招标单位和投标人的权利、义务不因推迟送交投标文件截止时间而改变。

(3)招标单位对截止时间以后收到的投标文件,将原封退回投标人。

3.投标文件的更改与撤回

(1)在投标文件截止时间以前,允许投标人更改或撤回投标文件。这种要求必须书面提出,并经投标文件签字人签署。

(2)更改的投标文件应同样按照投标文件送交规定的要求进行编写、密封、标记和送达。

(3)投标文件截止期以后,投标文件不得更改,需作澄清时,应按投标文件澄清条款的规定办理。

五、开 标

1.招标单位将按招标文件中规定的时间和地点,进行公开开标。投标人应委派代表按时出席。

2.开标由招标单位主持,可邀请上级主管部门或有关单位及公证机关派员参加。

3.开标时,招标单位将当场检查各投标文件的完整性,当众宣读投标函并公布投标价。

4.有下列情况之一者,将作为废标处理:

(1)投标函未加盖公章、未经法定代表人或其授权代理人签字;

(2)投标文件未按招标文件的内容和格式填写;

(3)投标人未按要求提交投标保证。

六、评 标

1.符合性审查

招标单位在进行投标文件评审前,应对各投标文件的符合性进行审查,如发现投标文件与招标文件的要求有重大偏离或保留,特别是对工程范围、工程质量或工期要求等方面有重大改变,而且,调整这种偏离或保留将会对其他符合招标原则的投标人的竞争地位产生不公正影响时,此投标文件将不予评审。

2.评审

(1)招标单位将按照国家和交通部的有关规定,组成由有关部门参加的评标机构进行评标。

(2)具体评标办法:

(3)招标单位将依据报价可信、工期合理、施工方案可行、施工技术可靠、确保工程质量的原则,全面比较后选取综合条件最优的最低评估标的投标人中标,不保证报价最低或工期最短的投标人中标。

3.投标文件的澄清与差错的修正

(1)在评标期间,招标单位认为需要时,可书面通知投标人对其投标文件进行澄清,或者要求补充某些资料,投标人不得拒绝,也不得借澄清问题的机会,对投标文件的标价和内容提出修改。

(2)对于符合招标要求的投标文件,若其报价有算术上的差错,将按以下原则修正:

①当以数字表示的金额与文字表示的金额有差异时,以文字表示的金额为准。

②当单价与数量相乘不等于合价时,总价合同应以标出的合价为准,同时对单价进行修正。(如果是单价合同,应以单价为准,同时对合价进行修正。)

③当各细目的合价累计不等于总价时,总价合同应以总价为准修正各细目合价,并核准单价。(如果是单价合同,应以分项合价累计数为准,修正总价。)



(3)按以上原则对差错的修正,应取得投标人的同意,并确认修正后的投标价。如果投标人拒绝确认,则其投标文件不予评审。

七、授标与签订合同

1.授标条件

本合同将授予其投标文件符合招标文件要求,综合条件最优,具备有效地履行本合同的能力、经验、信誉的投标人。

2.中标通知书

评标结果报请上级主管部门批准后,招标单位在投标有效期截止前向中标的投标人发出中标通知书,确认其投标已被接受。中标人收到中标通知书后,应按通知书中指定的时间与地点参加合同谈判并签署合同。

3.履约担保

(1)中标人在收到中标通知后14天内、合同协议书签署前,应按招标文件的规定向招标单位提交一份由银行出具的履约担保。履约担保金额为合同总价的(1%~3%)。履约担保的有效期至工程竣工验收合格后15天。

(2)若中标人未能按本款上述规定向招标单位提交履约担保,招标单位则有权取消其中标资格,并没收其投标保证金。招标单位有权将本合同授予其他投标人或重新招标。

4.合同协议书的签署

(1)中标人在收到中标通知后21天内,必须与业主签订合同协议书。

(2)合同协议书经双方法定代表人或其授权代理人签署并加盖公章后生效。合同协议书签署后,招标单位将通知其他未中标的投标人,并按期退还投标保证金。

(3)若签署合同协议书的双方或一方为法定代表人的授权代理人时,应出具法定代表人的授权书。

第三章合同协议书

第四章合同通用条款

第五章合同专用条款

(以上三章见"港口工程施工合同范本")


第二卷

第六章技术规格书

一、总 则

本合同工程包括永久工程、临时工程及保修期内对工程缺陷实施处理的维护工程。无论本技术规格书有无明确规定,承包人都有责任使工程质量满足现行技术标准,负责提供施工所必须的技术、劳务、材料、设备、施工装备和其它物品,对施工过程中涉及的安全、保卫、环境保护等全权负责。

1.工程范围和施工条件

(1)工程范围:(工程概况,本合同范围等)

(2)施工条件:(交通条件,水电供应,建筑材料供应情况等)

2.工程质量要求

本合同工程的施工质量,按交通部颁布的质量检验评定标准评定,应达到(优良或合格)等级。

3.技术标准

(1)工程施工中的所有材料、设备和施工质量均应符合下列技术规范的要求:

①交通部《港口工程技术规范(1987)》;

②交通部《港口工程质量检验评定标准jtj242-89》;

③交通部《疏浚工程施工技术规范jtj284-89》和《疏浚工程质量检验评定标准jtj243-88》;

④国家和地方政府颁布的有关技术法规和规范。

(2)在合同履行期间,若上述标准或规范有修改或重新颁布,承包人应遵照执行。

(3)必要时,技术标准的替代可按合同通用条款约定的方法办理。

4.工程计量

(1)本合同应计量的所有工程分项,均以我国法定计量单位计量。

(2)核定按合同提供的材料数量和完成的工程数量所采用的测量与计算方法,应符合技术标准。

(3)承包人应提供符合精度要求的计量设备和条件。一切工程的计量,经承包人计算后,报监理工程师审核确认。

(4)经监理工程师签认的工程计量结果是工程款支付额的计算依据。凡因承包商原因超过了图纸所示或未经监理工程师同意的任何长度、面积或体积的计量部分,均不予支付。

二、工程技术特殊要求

(根据工程的具体情况和特点,提出对本合同工程施工的具体技术要求。)

三、工程管理

1.工程报告

(1)承包人应向监理工程师提交开工报告、测量报告、试验报告、材料检验报告、各类工程(分项及隐蔽工程)自检报告、工程进度报告、竣工报告、工程事故报告以及监理工程师指定的其它报告等。

(2)承包人在分部(分项)工程开工前,向监理工程师提交的开工报告应包括:工程名称、工程部位、现场负责人名单、施工组织与劳力安排、材料供应、机械、设备到场情况、材料试验与质量检查手段、水电供应、临时工程修建、施工进度计划以及其他需要说明的事项等,经监理工程师同意后,才能开工。

2.施工测量

(1)工程开工前,承包人应根据图纸和监理工程师提供的书面测量资料和测量标志进行基点和基线的布设。承包人若对测量资料有怀疑,应在监理工程师现场交接后7天内向其提出,监理工程师应立即提出处理意见。承包人应将测量方法和测量结果提交监理工程师确认。

(2)承包人必须使用合格的测量仪器和设备。测量人员资质应取得监理工程师的认可。

(3)承包人在征得监理工程师同意后,可在开工前对必要地段进行水深测量,测量工作应接受监理工程师的监督,测量图在监理工程师签字确认后方可用于工程施工。

3.试验

(1)工程开工前,承包人应建立满足现场施工质量控制和试验所必需的工地试验室(或委托经监理工程师认可的质检试验室)。试验室的工作应接受监理工程师的监督。

(2)在取样与试验作业中,承包人应为监理工程师免费提供所需的一切协助。

4.施工船机

所有用于本工程的施工船机的类型和数量,必须满足本合同工程的要求,并保证状态良好。

5.材料

(1)凡用于永久性工程的一切材料,均必须符合有关技术标准的规定。

(2)材料的搬运、储存均应保证其质量不受损害。

(3)材料运抵现场时,均应附有厂商的材质检验合格证书或经监理工程师认可的试验室的试验报告。

6.工程记录

承包人应保存有关工程进度、质量检验、隐蔽工程、试验报告、障碍物拆除以及所有影响工程进度、质量的原始记录、照片和录相,以及材料、设备的来源资料。

7.工程检验

承包人应有各级专职或兼职的质量检验人员,对施工中每道工序按技术标准的要求进行自检。自检合格后,填写工程检验报告单,向监理工程师申请检验,经监理工程师签认合格后,才能进行下道工序的作业。

8.竣工资料

承包人应按照交通部的有关规定及合同要求编制竣工资料。各分部(项)工程的竣工图应在有关工程完工后陆续提交监理工程师审查。整个工程竣工资料经监理工程师审核同意并按合同要求复制约定份数后,方能进行竣工验收。

四、临时工程

1.临时工程的范围

临时工程包括为完成本合同工程承包人所需要的所有临时设施和工程,如办公室、宿舍、仓库、道路、供水、供电、通信、预制场地和堆存场地(水域)、实验室、围墙、出运和停靠码头、锚系设施、测量平台以及工程施工所必需的其它临时性设施。

2.业主提供的临时工程施工条件和设施

业主将提供以下条件和设施,供承包人建设临时工程和施工期间使用:(业主应提供的临水、临电、通讯的接口位置和可提供的用量,临时道路,可用以建设临时设施的陆域条件、水域条件和自然岸线等。如果业主可以提供某些临时设施,如施工用码头和岸线、小型构件预制畅仓库等,也应予以说明)

3.承包人需要建设的临时设施

除业主提供的上述设施外,承包人应根据工程施工需要,在业主提供的公用设施条件和临时工程施工条件下自行建造、管理和维修工程所需要的其他全部办公、生活、生产、试验用临时建筑和设施。临时工程开工前,承包人应将上述建筑物和设施的设计图纸、说明及使用期限等资料报业主核备。

4.水上设施和警戒、危险信号

承包人应对其所有的水上设施的临时锚泊作出安排和配备相应的设施,并应安装和维护一切必须的警戒信号和危险信号。这些锚泊设施的位置、锚泊方式、信号的功能、位置和数量应符合海上安全监督、港务等政府有关部门的要求,并报监理工程师核备。

5.为监理工程师提供的条件

(1)办公与生活用房及设施

承包人应按合同约定的内容、标准和数量向监理工程师提供办公及生活用房、办公与生活所需的一切设施,并负责这类设施的维护。

(2)通讯与交通设施

承包人应按合同约定向监理工程师提供通讯设施及交通工具。

6.临时工程的维护、保养和拆除

无论是业主直接提供的还是由承包人承建的临时工程,均为业主的财产,承包人应承担维护和保养责任。对业主提供的临时设施,工程竣工后,承包人应整修交还给业主。对由承包人承建的临时设施,承包人应根据业主的要求,将这些设施移交给业主,或在限定的期限内搬迁或拆除,并清除多余建筑材料和垃圾等。

7.临时工程的报价

承包人的临时工程报价应包括所有由承包人承建的临时设施的费用及其维护、拆除费用,以及业主提供给承包人使用的临时设施的整修、完善、改、扩建及维护费用。

五、本工程的替代方案(如果有)

1.替代方案的原则

(1)承包人在投标文件中可就本工程进行代案设计和投标。一个承包人只可以提交一个替代方案。

(2)替代方案应考虑由于结构的变化而引起的附属设施的变化,但不得对原设计的平面布置、范围、建筑标准和规模指标等做实质性的改变。

(3)完成替代方案设计的设计单位必须具备与该项目相适应的设计资质和能力。投标人在提交替代方案时,还应提交设计单位的有效资质证明。

(4)替代方案的设计必须达到交通部规定的初步设计的深度。替代方案的设计标准和工程质量标准应不低于本技术规格书的规定。替代方案的投标报价应包括替代方案的勘察设计的费用。

(5)替代标必须实行总价合同。

2.替代方案设计的文件

为便于业主对承包人提供的代案进行审查,代案设计的下述资料应附在承包人的投标

文件中:

(1)设计说明书;

(2)设计图纸;

(3)技术要求(与原设计技术规格书不同的内容);

(4)施工工艺及施工方法。


第三卷

第七章投标文件与保证书格式

一、投标文件格式

1.投标函

至:(招标单位名称)

1.在研究了(工程名称)工程施工的全部招标文件并考察了工程现场后,我们愿意按人民币(大写)万元的投标总价,承担招标文件中规定的承包人的全部义务。

2.如果你们接纳我们的投标,我们保证按照招标文件的要求进行施工准备,在接到开工通知后,按时开工,并在个月(或日历天)内完成本合同范围内的全部工程施工。

3.如果你们接纳我们的投标,我们将保证按照招标文件的要求提交履约担保。

4.我们同意在招标文件规定的投标有效期内遵守本投标文件的各项承诺,在此期限届满之前,本投标文件始终对我方具有约束力。

5.在合同协议书正式签署之前,本投标文件连同中标通知书将构成我们双方有约束力的合同文件。

6.我们理解,你们不保证最低标价或最短工期的投标人中标的声明。

7.随同本投标文件,我们出具人民币10万元的投标保证。我们如有下列行为之一时,

你们有权没收投标保证金,并可取消我们的中标资格:

(1)在投标有效期内撤回投标文件;

(2)未能或拒绝按招标文件的要求提交履约担保;

(3)在接到中标通知后21天内由于我方的原因未能或拒绝签订合同协议书。

投标人:(单位全称并加盖公章)

法定代表人

或其授权的代理人:(签字)

注册地址:

电话:

传真:

邮编:

日期:

投标函附录

2.附表

表1拟为本合同工程设立的组织机构图

表2拟在本合同工程任职的主要人员简历表

表3拟投入本合同工程的主要施工船机设备表

表4为本合同工程配备的主要材料试验、测量、质检仪器设备表

表5合同用款估算表

表6临时用地计划表

表7水电使用计划表

表8主要材料用量表

表9分包情况表(如果有)

二、保证书格式

1.授权书格式

致:(招标单位名称)

和(业主名称)

我作为(投标人名称)的法定代表人,授权(姓名)为我的合法代理人,代表我单位在(工程项目名称)工程的投标活动中,以我的名义签署投标文件、进行合同谈判、签订合同协议书和执行一切与此有关的决定。

投标人:(盖章)

授权人:(法定代表人签字)

被授权的代理人:(签字)

日期:

2.投标保证书格式

致:(招标单位名称)

鉴于(投标人名称)(下称"投标人")向贵单位送交了关于(工程项目名称)的投标文件。我行同意为投标人出具人民币壹拾万元的保函,作为投标人履行招标文件中规定义务的担保。

我行将履行担保义务,如果投标人:

(1)在投标文件有效期内撤回投标文件;

(2)在接到中标通知书后,由于投标人的原因未能按招标文件的规定或拒绝签署合同协议书或未能按照招标文件规定提供履约担保。

则我行保证在收到贵单位的书面要求并说明索款是由于出现了上述任何一种原因的具体情况后,凭贵单位出具的索款凭证,向贵单位支付上述款额。

本保函在下述有效期内有效。任何索款要求应在下述有效期限内交到我行。任何延长投标有效期的决定,应通知我行。

本保函有效期为:

担保银行:(全称)(盖章)

法定代表人

其授权的代理人:(签字)

地址:

邮编:

电话:

传真:

日期:

[来源:https://hetong.11665.com/hetong/zhaotoubiao/201203/6178.html ]
  • 上一个合同范本:
  • 下一个合同范本:
  • Copyright © 2012 合同范本网 hetong.11665.com, All Rights Reserve 网站地图